Fort Lewis Fire Station - Tacoma, WA

US Army Corps of Engineers designed the reclad of the current Fire Station #4 at Joint Base Lewis-McChord in Washington utilizing Terra5 rainscreen and a Vci.45 subframing system. The T30 terracotta allowed the designers to provide a new facade and complement other surrounding buildings.

Architect: 
US Army Corps of Engineers
Cladding Materials: 
System or Bracket: