Fuller Middle School - Framingham, MA
Located in Framingham, Massachusetts, the new Fuller Middle School showcases 6,700 square feet of Trespa HPL panels installed using ECO Cladding’s engineered rainscreen subframing system. Designed by Jonathan Levi Architects, the project blends educational functionality with a vibrant and durable facade solution.
ECO Cladding’s system provided the flexibility and structural integrity needed for Trespa’s dense panels while supporting the school’s energy performance goals. The high-pressure laminate panels contribute to a dynamic exterior, reflecting the school’s modern learning environment. This installation is a strong example of performance-driven rainscreen design in a public school setting.




